Scope of Work – Tasks to be Covered
From 14th and 15th May
Build Phase – Pre-Installation Activities
* Verify & Validate the Bill of Materials (active & passive components).
* Receive and Inspect network equipment (switches, APs, controllers, firewalls).
* Rack and Stack devices in designated positions as per the layout plan.
* Cable Management: Identify and label network cables for installation.
* Power Setup: Verify available PDU sockets and install redundant power sources if required.
* Provide Console Access for remote engineers to configure devices.
Cutover Phase – Installation & Migration Activities
Physically replace & install network devices, including:
* Switches (Core, Distribution, and Access Switches)
* Wireless Access Points (Ceiling/Wall Mounted)
* Gateway Controllers
* Firewalls
Cable Patching
* Perform inter-rack & intra-rack patching with copper and fiber cables.
* Ensure neat dressing and labeling of cables inside the racks.
Swapping Connections: Migrate endpoint connections from old to new switches.
Testing: Conduct power-on and connectivity tests for all installed devices.
User Acceptance Testing (UAT): Work with on-site contacts to verify device functionality.
Document Installation & Spare Materials: Submit a list of installed devices and leftover materials.
Take Before & After Photos of racks, patch panels, and cabling.